Pujiang Line
Shanghai Metro line

The Pujiang Line (simplified Chinese: 浦江线; traditional Chinese: 浦江線; pinyin: Pǔjiāng Xiàn) is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro line 8, but afterwards was constructed as a separate line, connecting with line 8 at its southern terminus, Shendu Highway. The line opened for passenger trial operations on March 31, 2018. It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of 6.689 kilometres (4.156 mi). The people mover was expected to carry 73,000 passengers a day. The line is colored gray on system maps.
The line is operated by Shanghai Keolis Public Transport Operation & Management Co. Ltd. (Chinese: 上海申凯公共交通运营管理有限公司), a joint venture owned by Keolis and Shanghai Shentong Metro Group for at least five years after opening.
01History
| Shanghai Metro Puijiang Line opening history | ||||||
|---|---|---|---|---|---|---|
| Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
| Shendu Highway, Huizhen Road | 25 Dec 2015 | 31 Mar 2018 | 6.689 km (4.16 mi) | 6 | Phase 1 | ¥3.177 billion |

02Stations
Service routes
| Shanghai Metro Pujiang Line service routes | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
| Routes | Station name | Connections | Distance | Location | Open- ing |
Plat- form | |||||
| M | English | Chinese | km | min | |||||||
| ● | Shendu Highway | 沈杜公路 | 8 Fengpu Express | 0.00 | 0.00 | 0 | Pujiang, Minhang | 31 March 2018 |
Elevated Two Side & one Island | ||
| ● | Sanlu Highway | 三鲁公路 | 2.00 | 2.00 | 3 | Elevated Side | |||||
| ● | Minrui Road | 闵瑞路 | 1.00 | 3.00 | 5 | ||||||
| ● | Puhang Road | 浦航路 | 0.80 | 3.80 | 7 | ||||||
| ● | Dongchengyi Road | 东城一路 | 1.20 | 5.00 | 9 | ||||||
| ● | Huizhen Road | 汇臻路 | 1.60 | 6.60 | 11 | Elevated Island | |||||
Important stations
- Shendu Highway - Passengers can interchange to line 8.
Future expansion
There are no plans to extend the line.
Station name change
- On June 9, 2013, the Aerospace Museum was renamed Shendu Highway (before Pujiang Line began serving the station).
03Headways
| Shanghai Metro Pujiang Line headway | ||||
|---|---|---|---|---|
| Time | Shendu Highway - Huizhen Road | |||
| Monday - Friday (Working Days) | ||||
| AM peak | 7:00-9:00 | 3 min and 20 sec | ||
| Off-peak | 9:30-18:00 | 6 min and 30 sec | ||
| PM peak | 18:00-20:00 | 3 min and 50 sec | ||
| Other hours |
| 8 min | ||
| Saturday and Sunday (Weekends) | ||||
| Peak | 7:00-20:00 | About 6 min | ||
| Other hours |
| About 9 min | ||
04Technology
Signalling
The entire operation of the new line is remotely controlled from a central dispatch room. Trains operate using the Cityflo 650 communications-based train control (CBTC) from CRRC Puzhen Bombardier Transportation Systems Limited, a joint venture between Bombardier and CRRC Nanjing Puzhen Co., Ltd. The automatic trains had initially six staff members working at each APM station, but the operator hopes to reduce that to one or two.
Rolling Stock
Pujiang Line uses rubber-tyred Bombardier Innovia APM 300 trains. The trains have 4 cars each, totaling 51 metres (167 ft) in length, with capacity for 566 passengers per train. There are large windows at each end of the train allowing passengers to look out the front and rear. The small trains with rubber tires running on concrete tracks allow for turning radii as tight as 22 m (72 ft) to be negotiated, compared to over 300 m (984 ft) for typical metro on steel rails. On 13 January 2017, Bombardier delivered the first out of 44 autonomous people movers to Shanghai.
| Shanghai Metro Pujiang Line rolling stock | ||||||||
|---|---|---|---|---|---|---|---|---|
| Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly | Rolling stock | Number | Notes |
| 44 | CRRC Nanjing Puzhen Co., Ltd. | 2016-2017 | L | 4 | Tc+T+T+Tc | Innovia APM 300 | T0101-T0111 (T010011-T010441) | Cars with rubber tires running on concrete tracks. Front of the train adopts an open driver's cab. Doors are wider (1980mm) than on Type A trains (1440mm). |
Sources and credits
This article is adapted from the Wikipedia article “Pujiang Line”, written by its contributors and licensed under CC BY-SA 4.0. Fathomly has changed the layout, removed citation markers, navigation and maintenance notices, and adjusted punctuation. This adapted version is shared under the same license. For references, see the original article.
Images, from Wikimedia Commons:
- 20180331浦江线运行中.jpg by MasaneMiyaPA, CC BY-SA 4.0
- 20180331浦江线列车内部.jpg by MasaneMiyaPA, CC BY-SA 4.0
Fathomly is not affiliated with or endorsed by the Wikimedia Foundation. Spotted a problem? Tell us.