New Shuttle
People mover in Japan

The New Shuttle (Japanese: ニューシャトル, Hepburn: Nyū Shatoru) is a manually operated, rubber-tyred people mover system in Saitama Prefecture, Japan.
The system's only route is the 12.7-kilometre (7.9 mi) Ina Line (伊奈線, Ina-sen), which runs north from Ōmiya Station in Saitama to Uchijuku Station in Ina. The line was built as part of an agreement to address local opposition to the construction of elevated viaducts for the Shinkansen through the area. The New Shuttle runs alongside the Shinkansen infrastructure for most of its route. Between Ōmiya and Maruyama, it is double-tracked and runs alongside the viaduct shared by the Tōhoku Shinkansen and Jōetsu Shinkansen. Between Maruyama and Uchijuku, the line continues alongside the Jōetsu Shinkansen on a single track. The New Shuttle's depot is located within the Y-shaped junction formed by the Tōhoku and Jōetsu Shinkansen lines at Maruyama.
It is operated by the third-sector railway company ’’‘Saitama New Urban Transit Co., Ltd.’’’ (埼玉新都市交通株式会社, Saitama Shin Toshi Kōtsū Kabushiki-gaisha), whose shareholders include the East Japan Railway Company (40%), the Saitama prefectural government (35%), various banks (15% collectively), Tobu Railway (5%), and the municipalities served by the line (5% collectively).
01Stations
The stations on the line are as follows. All stations are located in Saitama Prefecture.
| Colour/No. | Name | Distance (km) | Location | |
|---|---|---|---|---|
| Between stations |
Total | |||
| Ōmiya 大宮 |
, N/a | 0 (0) | Ōmiya-ku, Saitama | |
| Tetsudō-Hakubutsukan 鉄道博物館 |
1.5 (0.93) | 1.5 (0.93) | ||
| Kamonomiya 加茂宮 |
1.7 (1.1) | 3.2 (2.0) | Kita-ku, Saitama | |
| Higashi-Miyahara 東宮原 |
0.8 (0.50) | 4.0 (2.5) | ||
| Komba 今羽 |
0.8 (0.50) | 4.8 (3.0) | ||
| Yoshinohara 吉野原 |
0.8 (0.50) | 5.6 (3.5) | ||
| Haraichi 原市 |
0.8 (0.50) | 6.4 (4.0) | Ageo | |
| Shōnan 沼南 |
0.8 (0.50) | 7.2 (4.5) | ||
| Maruyama 丸山 |
1.0 (0.62) | 8.2 (5.1) | Ina | |
| Shiku 志久 |
1.2 (0.75) | 9.4 (5.8) | ||
| Ina-Chūō 伊奈中央 |
1.1 (0.68) | 10.5 (6.5) | ||
| Hanuki 羽貫 |
1.1 (0.68) | 11.6 (7.2) | ||
| Uchijuku 内宿 |
1.1 (0.68) | 12.7 (7.9) | ||
The line's depot is located near Maruyama Station.
02Rolling stock
As of 1 April 2016, the following train types are used on the line, all formed as six-car sets.
- 1050 series
- 2000 series
- 2020 series (since 4 November 2015)
1050 series
As of 3 June 2021, two 1050 series sets (52 and 53) were in service, formed as six-car sets as follows. They were repainted into their current livery in April 2019.
| Set No. | Car numbers | Livery | Date introduced | |||||
|---|---|---|---|---|---|---|---|---|
| 52 | 1152 | 1252 | 1352 | 1452 | 1552 | 1662 | Blue/White | April 1998 |
| 53 | 1153 | 1253 | 1353 | 1453 | 1553 | 1663 | Green/White | November 1999 |
2000 series
The 2000 series fleet consists of seven six-car sets (01 to 07) formed as follows. The trains have stainless steel bodies with different colour front ends and bodyside stripes.
| Set No. | Car numbers | Livery | |||||
|---|---|---|---|---|---|---|---|
| 01 | 2101 | 2201 | 2301 | 2401 | 2501 | 2601 | Reddish-purple |
| 02 | 2102 | 2202 | 2302 | 2402 | 2502 | 2602 | Orange |
| 03 | 2103 | 2203 | 2303 | 2403 | 2503 | 2603 | Green |
| 04 | 2104 | 2204 | 2304 | 2404 | 2504 | 2604 | Yellow |
| 05 | 2105 | 2205 | 2305 | 2405 | 2505 | 2605 | Blue |
| 06 | 2106 | 2206 | 2306 | 2406 | 2506 | 2606 | Red |
| 07 | 2107 | 2207 | 2307 | 2407 | 2507 | 2607 | Cherry blossom pink |
2020 series
The 2020 series fleet consists of six six-car sets (21 to 26) formed as follows. Built by Mitsubishi Heavy Industries, the trains have aluminium bodies. Each set has a different accent colour, as shown below.
The first 2020 series trainset, numbered 21, entered service on 4 November 2015. Set 22 entered service in February 2016, followed by set 23 in June 2016. A fourth trainset, numbered 24, entered service on 12 February 2019. The fifth trainset entered service in February 2020. A sixth trainset was delivered in November 2024.
| Set No. | Car numbers | Livery | Date introduced | |||||
|---|---|---|---|---|---|---|---|---|
| 21 | 2121 | 2221 | 2321 | 2421 | 2521 | 2621 | "Green crystal" | November 2015 |
| 22 | 2122 | 2222 | 2322 | 2422 | 2522 | 2622 | "Bright amber" | February 2016 |
| 23 | 2123 | 2223 | 2323 | 2423 | 2523 | 2623 | "Pure ruby" | June 2016 |
| 24 | 2124 | 2224 | 2324 | 2424 | 2524 | 2624 | "Golden Topaz" | February 2019 |
| 25 | 2125 | 2225 | 2325 | 2425 | 2525 | 2625 | "Twilight Amethyst" | February 2020 |
| 26 | 2126 | 2226 | 2326 | 2426 | 2526 | 2626 | "Rainbow" | November 2024 |
Former rolling stock
- 1010 series
By 1 April 2015, three 1010 series sets (15, 17, 19) remained in service, formed as six-car sets. The last set (set 7) was withdrawn following its last day in service on 26 June 2016.
03History
In the early 1970s, planning for what became the Tōhoku and Jōetsu Shinkansen progressed in parallel. However, construction planning took place amid growing public concern over noise and vibration from the Tōkaidō and San'yō Shinkansen.
Opposition developed along parts of the planned Tōhoku and Jōetsu corridors. In Ina, where the two Shinkansen lines were planned to branch, residents opposed the project because the construction would divide the town into three sections. Through the efforts of then-mayor Misao Kato, an agreement was reached to construct an urban railway as compensation for the affected communities, including residents of the neighboring Ōmiya, Ageo, and Ina municipalities. A standard railway was considered excessive given the anticipated demand along the Ina corridor, so an automated guideway transit (AGT) system, then a relatively new technology, was chosen as a medium-capacity option. Residents of Toda, Urawa and Yono received a separate heavy-rail connection, which became the Saikyō Line.
Saitama New Urban Transit Co., Ltd. was incorporated on 1 April 1980, to operate the new line. The company applied for a local railway business license on 4 December 1980 and received it on 3 April 1981. Construction began on 15 October 1981 and was completed in April 1983.
The first section, between Ōmiya and Hanuki, opened on 22 December 1983. The line initially operated with 1000 series trains, and approximately half of the services ran only between Ōmiya and Maruyama; services north of Maruyama operated at 40-minute intervals during the daytime.
Construction of the remaining section between Hanuki and Uchijuku was delayed by difficulties in acquiring land from two landowners along the planned route. Negotiations with one landowner were completed in March 1988, but negotiations with the remaining landowner continued. Activists associated with the Revolutionary Communist League, National Committee, which had been involved in the opposition to Narita Airport, intervened in support of the landowner, further complicating the negotiations. The landowner and activists constructed a protest hut beneath the planned route and barricaded themselves inside. They also staged protests from a tower above the structure, including throwing feces at authorities. On 17 February 1990, Saitama Prefecture carried out an administrative execution under the Land Expropriation Law. The landowner and activists were arrested for obstruction of public duties.
Because the planned guideway passed above the landowner's property, the prefecture acquired an air right over the property rather than acquiring the underlying land. The access road beneath the elevated guideway was not included in the expropriation and consequently remains discontinuous. A mesh-fenced shelter was subsequently constructed around the guideway in this section, indicating the location where the air right was acquired.
The remaining section between Hanuki and Uchijuku opened on 2 August 1990, completing the line.
On 14 October 2007, Ōnari Station was renamed Tetsudō-Hakubutsukan (lit. 'Railway Museum') to coincide with the opening of the Saitama Railway Museum.
On 16 January 2019, a tire on the rear car of an up train suffered a puncture and blowout and derailed from the guideway between Kamonomiya and Tetsudō-Hakubutsukan. The accident suspended service on the entire line until the following afternoon, with substitute bus services provided during the disruption. Following the accident, the company began installing tire-pressure monitoring systems on its trains in 2020.
The 1050 series was withdrawn from service on 15 February 2026.
Sources and credits
This article is adapted from the Wikipedia article “New Shuttle”, written by its contributors and licensed under CC BY-SA 4.0. Fathomly has changed the layout, removed citation markers, navigation and maintenance notices, and adjusted punctuation. This adapted version is shared under the same license. For references, see the original article.
Images, from Wikimedia Commons:
- New-Shuttle Series2020-21F 21.jpg by MaedaAkihiko, CC0
Fathomly is not affiliated with or endorsed by the Wikimedia Foundation. Spotted a problem? Tell us.