Solar power plant in California, US

Image credit is listed at the end of this article.

The Mojave Solar Project (MSP) is a concentrated solar power (CSP) facility in the Mojave Desert in California, about 20 miles (32 km) northwest of Barstow. Surrounding the hamlet of Lockhart, Mojave Solar is adjacent to Harper Lake and the SEGS VIII-IX solar plant.

The site was originally reserved for the planned, never built, SEGS IX and XII. For 15 years following its construction in 1990, SEGS VIII-IX was the largest commercial solar power plant in the world, generating around 160 MW at its peak. It is one of three separately owned sites within 40 miles (64 km) of one another, that make up the nine solar fields in the Solar Electric Generating System (SEGS #1 and 2 are at Daggett, and #3 through 7 are at Kramer Junction). Harper Lake was the last of these built, and is designated as SEGS #8 and 9. It is still online, but has been surpassed by other newer facilities, including the Mojave Solar Project.

MSP, with a combined nameplate capacity of 250 MW (gross 280 MW), is made of two, independently operable, solar fields. The power plant cost an estimated $1.6 billion in total and entered commercial operation in December 2014. The developer, Abengoa, has successfully secured a $1.2 billion loan guarantee from the US government for the project. The plant is expected to generate 617,000 MWh of power annually, enough power for more than 88,000 households and to prevent the emission of over 430 kilotons of CO2 a year. Pacific Gas & Electric has agreed to a 25-year power purchase agreement.

The plant was commissioned on 1 December 2014.

01Technology

Using the desert's solar thermal energy, the facility generates steam in solar steam generators, which expands through a steam turbine generator to produce electrical power from twin, independently operable solar fields, each feeding a 125 MW power island. Generation is provided 100% from sun, no supplement from fossil-based energy sources. There is a gas-fired auxiliary boiler, for each field, only to provide equipment and heat-transfer fluid (HTF) freeze protection, when temperatures fall below 54 °F (12 °C).

The power cycle is a Rankine-with-reheat thermodynamic cycle from heat supplied via heat-transfer fluid, solar field heated up to 740 °F (393 °C). When operating, the transfer fluid enters the solar field at about 520 °F (271 °C). The steam generator steam exit temperature is about 720 °F (382 °C).

Each field utilizes 1128 solar collector arrays (SCA) sited on about 710 acres (290 ha). Each SCA, model E2 from Abengoa (derived from Luz's LS-3), is 125 metres (410 ft) long and is made of 10 solar collector elements (SCE), 12 metres (39 ft) long each and 5.76 metres (18.9 ft) aperture. The E2 steel frame collector with monolithic glass reflector panels, yields a total aperture area of 691.2 square metres (7,440 sq ft). That makes a total of 779,674 square metres (8,392,340 sq ft) aperture each solar field, 1,559,347 square metres (16,784,670 sq ft) total for the plant, operating about 3,024 hours per year.

Cooling is provided by wet cooling towers; water for the towers and solar collector washing, is supplied from onsite groundwater wells. Water from condensed steam exits the cooling tower pump at about 80 °F (27 °C), before cycling back to the steam generator.

The array of parabolic troughs at the Mojave Solar Project site in their stow position.
The array of parabolic troughs at the Mojave Solar Project site in their stow position.

02Production

Mojave Solar Project production is as follows (values in MW·h).

Generation (MW·h) of Mojave Solar Project
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2015 4,81628,25449,10457,83049,13243,61864,35363,36757,55937,40632,81815,319 503,576
2016 4,63542,34841,89054,99175,56980,33887,56579,15368,24545,34630,31514,512 624,907
2017 6,05522,19654,50461,40876,17978,36274,44358,47863,66355,25521,81821,669 594,030
2018 21,68837,48948,73342,96678,03584,95670,26771,78874,92951,47313,9768,880 605,180
2019 7,51511,39046,36958,35558,08777,83568,90459,39446,77147,29325,1667,405 514,484
2020 12,12934,52136,29652,91576,14362,31784,93570,61742,02342,47927,70516,334 558,414
2021 12,79112,86847,67168,07680,16172,88162,81174,11263,47843,96233,88515,281 587,977
2022 11,42320,95655,56066,31776,01180,54971,09566,27556,93948,81727,42314,337 595,702
2023 16,98120,73940,76273,16878,78177,36882,41568,12563,30149,83727,68613,239 612,402
Total (2015-2023)5,196,672

Maximum production was planned at 617,000 MW·h per year.

Watch videos about Mojave Solar ProjectExplainers and documentaries on YouTube (opens in a new tab)

Sources and credits

This article is adapted from the Wikipedia article Mojave Solar Project, written by its contributors and licensed under CC BY-SA 4.0. Fathomly has changed the layout, removed citation markers, navigation and maintenance notices, and adjusted punctuation. This adapted version is shared under the same license. For references, see the original article.