George Chaffey Bridge
Bridge

The George Chaffey Bridge is a road bridge in Australia that carries the Sturt Highway across the Murray River from Buronga to Mildura.
01History
Old Mildura Bridge
The previous Mildura Bridge was opened on 22 October 1927. The design allowed for it to carry both road and railway traffic, but railway tracks were never laid. It was a lift-span bridge supported by concrete pylons, with two approach spans on each side. Two of the truss spans and the lift span are now in the Mildura Marina.
Current bridge
Named in honour of engineer George Chaffey, the current bridge was opened on 12 March 1985, by Federal, New South Wales and Victorian transport ministers Peter Morris, Laurie Brereton and Steve Crabb. The project was funded under the Australian Bicentennial Road Development Programme, constructed at a cost of $14 million.
The nine-span, 331 metres (1,086 ft) long and 9.8 metres (32 ft) wide, prestressed concrete bridge was designed and constructed by the Department of Main Roads. The Victorian approach is 500 metres (1,600 ft) long, with a six-span, high-strength reinforced concrete I-beam floodway bridge, 80.4 metres (264 ft) long. The New South Wales approach to the main bridge crossing is 1.3 kilometres (0.81 mi) long, and includes three floodway bridges.
Sources and credits
This article is adapted from the Wikipedia article “George Chaffey Bridge”, written by its contributors and licensed under CC BY-SA 4.0. Fathomly has changed the layout, removed citation markers, navigation and maintenance notices, and adjusted punctuation. This adapted version is shared under the same license. For references, see the original article.
Images, from Wikimedia Commons:
- ChaffeyBridgeMildura.jpg by The original uploader was Longhair at English Wikipedia., CC BY 2.5
Fathomly is not affiliated with or endorsed by the Wikimedia Foundation. Spotted a problem? Tell us.